You can build on top of a removed pool in Arizona only if the pool was fully removed, meaning every bit of shell, plumbing and deck came out and the hole was backfilled in compacted, tested lifts. A partial removal, where the shell is broken up and buried, leaves ground that cannot be trusted under a footing, and Maricopa County and most Valley cities will not permit a structure on it. So the question you actually need to answer before the pool comes out is what you want that ground to do afterward. That decides which removal you need.


Full Removal vs Partial Removal, in Plain Terms

A partial removal, sometimes called a fill-in, punches holes in the floor for drainage, breaks the top few feet of wall down, and backfills over the rubble. It is faster and less expensive, and it is fine for turf, gravel, a garden or a paver patio. The ground is not engineered, and the buried shell is a disclosure item when you sell.

A full removal takes out the entire shell, the deck, the rebar, the plumbing and the equipment pad, and hauls it all off. Then the hole is backfilled in lifts of eight to twelve inches, moisture conditioned, compacted with a plate or roller, and density tested by a soils engineer. That is engineered fill, and it is what a building department needs to see before it will issue a permit for a slab, a casita, a garage or an addition on that spot.


What the County and Cities Want to See

Most Valley jurisdictions require a demolition permit for either type of removal, and for a full removal with future construction they typically want:

•      A compaction report from a licensed geotechnical engineer, with density tests at intervals as the fill goes up.

•      Proof the pool plumbing and electrical were capped or removed and the gas line to the heater, if any, was capped by a licensed plumber.

•      Drainage that does not send water toward the house or the neighbor.

•      On the building permit later, the compaction report attached so the footing design can rely on it.

If the fill was not tested, the engineer for your new structure will usually require over-excavation and recompaction before footings, which means digging out what you just paid to fill. We compared the two removal types in more detail in our pool removal guide.


A Scottsdale Backyard That Became a Casita

A homeowner in Scottsdale wanted to take out a 1980s diving pool and put a casita where it sat for a parent moving in. A demolition company had quoted a partial fill-in because it was cheaper. Fortunately their architect asked what was under the proposed footings before they signed.

We did the full pool demolition and removal, hauled the shell and deck, and backfilled in tested lifts with the soils engineer on site for density readings at each stage. The compaction report went straight into the casita's permit package. Footings were dug two months later with no over-ex required. If they had gone with the fill-in, they would have paid for the removal twice.


The Honest Part: Full Removal Is Not Always Worth It

If you are certain you will never build on that spot, a partial removal is the cheaper path and we do plenty of them. Grass, a putting green or a paver patio does not care about compaction reports. The risk is changing your mind. We have re-excavated buried pool shells for people who decided five years later they wanted a garage, and that is the most expensive version of this job. When in doubt, and especially if the pool sits where a structure could go, spend the difference on the full removal and the compaction report.


Call Phoenix Pro Excavating About Building on a Removed Pool

If you are planning to build on a removed pool, or you just want the ground done right, Phoenix Pro Excavating will tell you which removal fits your plans and handle the demolition, hauling, backfill and site preparation and grading in one scope. Ten-plus years, more than 150,000 tons of Valley dirt moved, mini and full-size excavators for tight backyards. Call 623-299-2172 for an estimate within 24 hours.


Frequently Asked Questions

Can I put a pool back in the same spot later?

Yes, if the removal was full and the fill was compacted and documented. Our pool excavation crews dig through engineered fill routinely. Digging through a buried shell is far more work.

How long after a full pool removal can you build?

As soon as the compaction report is issued, usually within a few days of the final lift. There is no waiting period for engineered fill to settle, because it has already been compacted to spec.

Do I have to disclose a removed pool when I sell?

In Arizona a buried pool shell from a partial removal is generally a disclosure item. A full removal with a compaction report is easier to document and rarely a concern for buyers or lenders.




Contact Phoenix Pro Excavating

Phoenix Pro Excavating

11801 N Tatum Blvd, Suite E

Phoenix, AZ 85028

Phone: 623-299-2172

Stay connected with Phoenix Pro Excavating for excavation tips, project updates, and helpful information for property owners and contractors across the Phoenix area.

Follow Phoenix Pro Excavating Online:

Facebook | X | Instagram | YouTube


What Is Concrete Coring? When Phoenix Projects Need It
November 20, 2026
Concrete coring drills clean holes through slabs and walls for pipes, conduit, and anchors. A Phoenix excavator explains when you need it. Call 623-299-2172.
Why Do Contractors Saw-Cut Concrete Before Removing It?
November 13, 2026
Concrete saw cutting gives a clean edge, protects the slab you keep, and controls dust. When Phoenix jobs need it and when they do not. Call 623-299-2172.
Can You Build a Basement in Phoenix?
November 6, 2026
You can build a basement in Phoenix. Caliche, hauling and waterproofing are why most homes do not have one. An excavator explains. Call 623-299-2172.
How Deep Does a Trench Need to Be in Arizona?
October 30, 2026
Trench depth for electrical, water, gas and irrigation lines in Arizona, plus why caliche changes the job. Estimates in 24 hours: 623-299-2172.
What Is the Best Time of Year to Excavate in Phoenix?
October 30, 2026
What is the best time of year to excavate in Phoenix? Heat, monsoon, caliche and scheduling explained by a local excavation contractor. 623-299-2172.
Do I Need a Demolition Permit to Tear Down a House?
October 23, 2026
Tearing down a house in Phoenix needs a demolition permit. Here is what the city asks for, how long it takes and where the debris goes. Call 623-299-2172.
Septic Inspection to Sell a House in Arizona?
October 16, 2026
Selling a home on septic in Arizona? ADEQ requires a transfer-of-ownership septic inspection before closing. What it covers and how to pass. Call 623-299-2172.
What Is a Septic Perc Test in Arizona?
October 10, 2026
What is a septic perc test in Arizona, and why does caliche matter? How soil testing shapes your septic system. Estimates in 24 hours: 623-299-2172.
Bulldozer kicking up dust as it provides land clearing services in Phoenix AZ
By Phoenix Pro Excavating • October 4, 2026
Land clearing covers brush, stumps, cactus, rocks and debris, plus dust permits and native plant notices. Call Phoenix Pro Excavating at 623-299-2172.
Aerial view of a yellow excavator working on site prep before excavation
By Phoenix Pro Excavating • September 18, 2026
How long does site prep take before you can build in Phoenix? Phoenix Pro Excavating walks through each stage and what slows it down. 623-299-2172.